Petroleum Processing and Petrochemicals
• 节能 • Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract: Using process simulation software Pro/Ⅱ, a case study for the improvement schemes of an absorption-stabilization system of a FCC unit was carried out from the energy-saving and optimization standpoint, and an optimal improvement idea was proposed consequently. The impact of various operation parameters on the process and energy consumption was investigated, finally, measures for optimizing process operation was put forward, such as set a reboiler at the middle part of desorption tower to realize the optimal cold feeding mode of desorption tower, the reboiler duty at the bottom could be reduced, the amount of desorption gas and supplemental absorbent could be decreased significantly and the operation load of the unit would be lowered.
Key words: absorption-stabilization, desorption gas, reboiler duty, absorbent
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.sylzyhg.com/EN/
http://www.sylzyhg.com/EN/Y2011/V42/I3/75