The heating furnace of delayed coker in SINOPEC Luoyang Co. consisted of two heating chamber with four feeding inlet. To meet the fuel and petrochemical market volatility, according to the benefit of priority, the original structure of the furnace was first changed to a single heating chamber furnace. This change caused some problems: coking at the outlet of the heating furnace was occurred, more compressor surge was happened, the pump was damaged, the operation difficulty of the fractionation tower was increased and the quality of gasoline and diesel was adversely impacted. Several measures were adopted: injecting steam into furnace tube, extending the coking cycle, controlling the oil flow rate and recycling light hydrocarbon fractions, to ensure the safe and stable operation of the device. At the same time, the raw material was fed into the catalytic cracking unit. The benefit of about 5.4 million Yuan per month was obtained.
Key words: delayed coking, furnace, single heating chamber furnace, coking, operation difficulty
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.sylzyhg.com/EN/
http://www.sylzyhg.com/EN/Y2015/V46/I12/64
[1] 赵日峰,肖家治,沈国平,孙柏军,王兰娟,徐宝平,杨军卫,叶晓东,凌逸群等.一种焦化加热炉[P]:中国,201010554752,2010-11-23 [2] 肖家治,《洛阳石化140 万吨/年延迟焦化加热炉节能增效改造方案》[Z],2011.10 [3] 瞿国华, 黄大智,梁文杰. 延迟焦化在我国石油加工中的地位和前景[J],2005,21(3):48-55 [4] 袁国利. 基于TS3000系统的延迟焦化富气压缩机防喘振控制探讨[J],压缩机技术,2010, 222(4):11-16 [5] 侯继承,许萧.延迟焦化分馏塔除盐新技术的工业应用[J],炼油技术与工程,2014,44(9):13-17 [6] 梁朝林,沈本贤,吴世逵,等.焦化反应温度、循环比对反应产物分布的影响[J],茂名学院学报,2008,,1(6):1-4 [7] 陈奎.延迟焦化装置技术改造方案的选择[J] ,2006,23(2):27-30 [8] 韩靖.延迟焦化加热炉炉管结焦分析[J],通用机械,2010,12(7):50-54 [9] 汪五四. 延长生焦时间对延迟焦化装置的影响[J],安徽化工,2003,123(3):29-30 [10] 岳海艳,李 英,杜 颖. 延迟焦化装置长周期运行的影响因素分析及改进措施[J],2008,28(2):122-124 [11] 李树成,姜光武. 提高现有延迟焦化装置处理量的几点措施[J],天然气与石油,2009,27(5):44-48