Petroleum Processing and Petrochemicals ›› 2017, Vol. 48 ›› Issue (6): 61-64.
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Supported by:
Abstract: To produce national V gasoline, the optimum scheme for the plant around S Zorb device was conducted. Through the comprehensive analysis of the hydrogen balance, product distribution as well as octane number, the optimal sulfur content in S Zorb feed was determined, making the benefit increase 5.2 Yuan RMB per ton crude oil. By optimizing the operating parameters of the S Zorb gasoline stabilization tower and recycling part of LPG in winter, the octane number loss reduces by 0.3. After optimizing processing routs for dry gas of S Zorb unit, the benefit increases 240 Yuan RMB per ton dry gas.
Key words: S Zorb, clean gasoline production, octane number, optimization of production plan
CLC Number:
 
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.sylzyhg.com/EN/
http://www.sylzyhg.com/EN/Y2017/V48/I6/61