中国石化洛阳分公司延迟焦化装置加热炉为两室四路进料,首次采用单炉室生产方案后,出现了加热炉出口处易结焦堵塞、压缩机喘振概率增加、机泵寿命缩短、分馏塔操作难度增加和汽油、柴油质量受到影响等问题。通过采取炉管注汽、延长生焦周期、控制甩油流量以及进行轻烃回炼等应对措施,保证了装置的平稳运行,同时将原料优化至催化裂化装置处理,每月产生效益约540万元。
关键词: 延迟焦化, 加热炉, 单炉室, 焦化, 操作难点
Abstract:
The heating furnace of delayed coker in SINOPEC Luoyang Co. consisted of two heating chamber with four feeding inlet. To meet the fuel and petrochemical market volatility, according to the benefit of priority, the original structure of the furnace was first changed to a single heating chamber furnace. This change caused some problems: coking at the outlet of the heating furnace was occurred, more compressor surge was happened, the pump was damaged, the operation difficulty of the fractionation tower was increased and the quality of gasoline and diesel was adversely impacted. Several measures were adopted: injecting steam into furnace tube, extending the coking cycle, controlling the oil flow rate and recycling light hydrocarbon fractions, to ensure the safe and stable operation of the device. At the same time, the raw material was fed into the catalytic cracking unit. The benefit of about 5.4 million Yuan per month was obtained.
Key words: delayed coking, furnace, single heating chamber furnace, coking, operation difficulty
王志刚 翟志清 李晓昌 赵岩. 延迟焦化装置加热炉单炉室生产方案的应用[J]. 石油炼制与化工, 2015, 46(12): 64-67.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.sylzyhg.com/CN/
http://www.sylzyhg.com/CN/Y2015/V46/I12/64
[1] 赵日峰,肖家治,沈国平,孙柏军,王兰娟,徐宝平,杨军卫,叶晓东,凌逸群等.一种焦化加热炉[P]:中国,201010554752,2010-11-23 [2] 肖家治,《洛阳石化140 万吨/年延迟焦化加热炉节能增效改造方案》[Z],2011.10 [3] 瞿国华, 黄大智,梁文杰. 延迟焦化在我国石油加工中的地位和前景[J],2005,21(3):48-55 [4] 袁国利. 基于TS3000系统的延迟焦化富气压缩机防喘振控制探讨[J],压缩机技术,2010, 222(4):11-16 [5] 侯继承,许萧.延迟焦化分馏塔除盐新技术的工业应用[J],炼油技术与工程,2014,44(9):13-17 [6] 梁朝林,沈本贤,吴世逵,等.焦化反应温度、循环比对反应产物分布的影响[J],茂名学院学报,2008,,1(6):1-4 [7] 陈奎.延迟焦化装置技术改造方案的选择[J] ,2006,23(2):27-30 [8] 韩靖.延迟焦化加热炉炉管结焦分析[J],通用机械,2010,12(7):50-54 [9] 汪五四. 延长生焦时间对延迟焦化装置的影响[J],安徽化工,2003,123(3):29-30 [10] 岳海艳,李 英,杜 颖. 延迟焦化装置长周期运行的影响因素分析及改进措施[J],2008,28(2):122-124 [11] 李树成,姜光武. 提高现有延迟焦化装置处理量的几点措施[J],天然气与石油,2009,27(5):44-48