石油炼制与化工 ›› 2025, Vol. 56 ›› Issue (10): 101-109.

• 控制与优化 • 上一篇    下一篇

考虑上游资源约束的炼油厂下游原油调度方案

牟宏斌,周祥,杨帆   

  1. 中石化石油化工科学研究院有限公司
  • 收稿日期:2025-04-21 修回日期:2025-06-25 出版日期:2025-10-12 发布日期:2025-10-09
  • 通讯作者: 周祥 E-mail:zhoux.ripp@sinopec.com

DOWNSTREAM CRUDE OIL SCHEDULING IN REFINERIES CONSIDERING UPSTREAM RESOURCE CONSTRAINTS


  • Received:2025-04-21 Revised:2025-06-25 Online:2025-10-12 Published:2025-10-09

摘要: 从炼油企业下游入手研究原油储运调度问题,创新性地构建了一种炼油厂下游约束规划模型。在传统原油调度约束基础上,新增了包含油轮卸油资源在内的上游资源量逻辑约束,结合长输管线延迟输送的运行特征,形成考虑上游资源约束的炼油厂下游原油调度方案。通过案例对所建模型进行求解,结果表明:该模型具有显著的求解效率优势,不同时间段划分情况下,均在0.6~1.7 s内获得可行性调度方案;以将10 d调度周期划分为11个时间段为例,在求解0.64 s时获得首个可行性调度方案,该方案下游生产在上游资源供给范围内进行,且完全匹配长输管线的运行特征,调度周期内两套常减压蒸馏装置保持连续平稳运行,仅分别进行了1次油种切换。

关键词: 原油调度, 约束规划, 上下游连接, 长输管线

Abstract: Starting from the downstream of the oil refining enterprises, the problem of crude oil storage and transportation scheduling was studied, and a downstream constraint planning model of the oil refinery was innovatively constructed. On the basis of the traditional crude oil scheduling constraints, the logical constraints of upstream resource quantities including the unloading resources of oil tankers were added. Combined with the operational characteristics of delayed transportation in long-distance pipelines, a downstream crude oil scheduling scheme considering upstream resource constraints for the oil refinery was formed. The established model was solved through a case study. The results show that the model has a significant advantage in solving efficiency. Feasible scheduling schemes were obtained within 0.6 to 1.7 seconds under different time period divisions. Taking the division of a 10 days scheduling cycle into 11 time periods as an example, the first feasible scheduling scheme was obtained in 0.64 seconds. This scheme ensures that the downstream production is carried out within the range of upstream resource supply and fully matches the operational characteristics of long-distance pipelines. During the scheduling cycle, the two sets of atmospheric and vacuum distillation units maintained continuous and stable operation, with only one oil type switch for each.

Key words: crude oil scheduling, constrained programming, upstream-downstream connectivity, long-distance pipelines