石油炼制与化工 ›› 2026, Vol. 57 ›› Issue (11): 45-51.

• 加工工艺 • 上一篇    下一篇

300 kt/a丙烷/异丁烷混合脱氢装置产物干燥系统长周期运行优化措施与工业实践

郭峰,张丽丽,白永涛,宋红燕   

  1. 陕西延长石油(集团)有限责任公司延安石油化工厂
  • 收稿日期:2026-03-10 修回日期:2026-07-07 出版日期:2026-11-12 发布日期:2026-10-19
  • 通讯作者: 白永涛 E-mail:yhbyt2011@163.com

OPTIMIZATION MEASURES AND INDUSTRIAL PRACTICES FOR LONG-TERM OPERATION OF THE PRODUCT DRYING SYSTEM IN A 300 kt/a PROPANE/ISOBUTANE MIXED DEHYDROGENATION UNIT

  • Received:2026-03-10 Revised:2026-07-07 Online:2026-11-12 Published:2026-10-19

摘要: 针对300 kt/a丙烷/异丁烷混合脱氢装置产物干燥系统(RED)在长周期运行中出现H?S和水含量超标、干燥剂粉化失效、冷箱冻堵等核心问题,结合装置“三年一修”的生产规划要求,系统分析吸附与再生阶段的关键影响因素,对RED单元进行优化改造,包括干燥器再生控制系统顺控程序参数优化、产物冷却系统技术改造、增设重整氢气干燥单元、更换高沸点芳烃洗涤溶剂、RED单元扩容改造,取得了显著成效。工业应用结果表明:优化后干燥器出口未检出H?S和水,解决了H?S与水的穿透问题;RED单元运行寿命延长至4a以上,匹配“三年一修”的检修要求,实现装置长周期运行。该优化方案避免了因更换干燥剂导致的非计划停工,直接经济效益为627.56万元,每年节约成本约430万元,为同类脱氢装置RED单元的长周期安全运行提供了范例。

关键词: 丙烷/异丁烷混合脱氢, 产物干燥系统, H2S穿透

Abstract: For the product drying system (RED) of a 300 kt/a propane/isobutane mixed dehydrogenation unit, several core problems emerged during long-term operation, including excessive H2S and water content, desiccant pulverization and deactivation, and cold box freezing and blockage. In response to these issues and in accordance with the unit's production planning requirement of "three-year turnaround interval", a systematic analysis of the key influencing factors during the adsorption and regeneration stages was conducted. A comprehensive optimization and retrofitting scheme for the RED unit was implemented, including the optimization of the sequential control program parameters of the dryer regeneration control system, technical transformation of the product cooling system, addition of a reforming hydrogen drying unit, replacement of high boiling point aromatic hydrocarbon washing solvents, and capacity expansion of the RED unit. Remarkable improvements were achieved. Industrial application results demonstrate that after optimization, no H2S or water was detected at the dryer outlet, effectively resolving the breakthrough issue ofH2S and water. The service life of the RED unit was extended to over 4 years, aligning with the "three-year turnaround" maintenance schedule and enabling long-term continuous operation of the plant. This optimization scheme successfully avoids unscheduled shutdowns caused by desiccant replacement, yielding a direct economic benefit of 6.275 6 million yuan and an annual cost saving of approximately 4.3 million yuan. This work provides a valuable reference for achieving long-term safe operation of RED units in similar dehydrogenation facilities.

Key words: propane/isobutane mixed dehydrogenation, product drying system, H?S penetration