摘要: 对中国海油宁波大榭/舟山石化有限公司2.4 Mt/a延迟焦化装置配套的液化气脱硫塔存在的液泛问题进行了分析,并有针对性地提出了解决方案和改造措施。延迟焦化产出的液化气中含有大量焦粉,在液化气脱硫塔中不断沉积,从而使脱硫塔填料或塔盘堵塞并产生液泛现象。为了保证正常生产,必须对脱硫塔切出进行清理。为了解决脱硫塔切出后不合格液化气的问题,对脱硫装置流程增加2台静态混合器。改造后的简易脱硫流程能保证液化气在脱硫塔切出的状态下质量合格,从而大大降低了因处理脱硫塔而引起的经济损失。
关键词: 液化气 , 脱硫塔, 堵塞, 处理
Abstract: Causes for flooding in the desulphurization tower of 2.4 Mt/a delayed coking unit of Ningbo Daxie/Zhoushan Petrochemical Co., Ltd. was analyzed, and the countmeasures were proposed. The liquefied gas from delayed coking unit contains a large amount of coke powder, which continuously deposited in the LPG desulfurization tower, and cause the blockage of packing or tray in desulfurization tower, resulting in the liquid flooding. In order to ensure normal production, the desulfurization tower must be frequently cut out and cleaned, leading to disqualified LPG product. Therefore two static mixers were added to the desulfurization process. This simple modification of desulfurization process can guarantee the quality of the liquefied petroleum gas during the cutting out of the desulfurization tower, thus can markedly reduce the economic loss.
Key words: liquefied petroleum gas, desulfur tower, blockage, treatment
贾正万 俞欢 陈进旺. 延迟焦化液化气脱硫塔堵塞的原因分析与解决措施[J]. , 2018, 49(4): 35-38.