石油炼制与化工 ›› 2013, Vol. 44 ›› Issue (1): 46-50.

• 基础研究 • 上一篇    下一篇

渣油与废道路沥青共延迟焦化效果研究

孙辉,田立达,沈本贤   

  1. 华东理工大学化学工程联合国家重点实验室
  • 收稿日期:2012-05-02 修回日期:2012-06-06 出版日期:2013-01-12 发布日期:2013-03-19
  • 通讯作者: 沈本贤 E-mail:sbx@ecust.edu.cn

STUDY ON THE DELAYED COKING OF RESIDUE OIL WITH WASTE ROAD ASPHALT

  • Received:2012-05-02 Revised:2012-06-06 Online:2013-01-12 Published:2013-03-19

摘要: 利用由结构导向集总新方法构建的延迟焦化动力学模型计算了渣油掺炼废道路沥青的共焦化效果。结果表明,废道路沥青能够作为延迟焦化掺炼原料。小试试验表明,在470 ℃,0.15 MPa,零循环比条件下,80%渣油和20%废道路沥青共焦化比80%渣油焦化气体收率增加2.3百分点,液体收率提高2.91百分点,焦炭收率增加14.79百分点。通过焦化产物性质对比和经济性估算证实,废道路沥青作为延迟焦化掺炼原料是其再利用的一条新途径。

Abstract: The coking of a mixture containing residue oil and waste road asphalt was calculated by a delayed coking kinetic model built by structure oriented lumping method, and the results showed that waste road asphalt could be used as a blending material for delayed coking. Experimental results indicated that under the operating conditions of 470 ℃, 0.15 MPa and without recycle, as compared with the 80% yields of total residue oil coking, for coking of this residue oil mixed with 20% waste road asphalt, the yield increase of gas, liquid and coke was 2.30, 2.91 and 14.79 percentage point, respectively. By comparing products properties and economic estimation, it was confirmed that waste road asphalt as delayed coking blending material could be a new approach for its recycling.